Periods
- No period data has been added yet
Season
- A rescue excavation was undertaken during work on the construction of the railway line running north-west of Vesuvius – Lot B 2, which crosses the territories of S. Anastasia and Somma Vesuviana (NA), along a stretch circa 900 m in length and 25 m wide. Th... Read More
- 600 BC
- 100 BC
- 100 AD